Cloud & Infrastructure
Cloud Solutions & DevOps
Cloud migration and platform work across AWS, Azure and GCP. We land infrastructure-as-code and a rollback path before moving any production traffic, because the interesting part of a migration is not the happy path — it is what happens at 2am when something does not come back up.
What we do
- AWS · GCP · Azure landing zones
- Kubernetes, Docker and Terraform
- CI/CD and blue-green deploys
- Cost optimisation & FinOps reviews
What you end up with
- A landing zone defined entirely in Terraform
- CI/CD pipelines with automated rollback
- Observability — logs, metrics, traces and alerting that pages the right person
- A cost baseline with the obvious waste removed
How an engagement runs
- 01
Discovery & scope
A working session to map the problem, the constraints and the smallest thing worth building first.
- 02
Architecture & design
System design, data model and interface work — reviewed with you before a line of production code exists.
- 03
Build in two-week slices
Shippable increments every sprint, deployed to a staging environment you can click through.
- 04
Launch & operate
Hardening, observability and an agreed support model. We stay on after go-live.
Proof
Questions we get asked
- Can you migrate without downtime?
- Usually, yes. We run the new and old environments in parallel and cut traffic over gradually, which also means the rollback is a routing change rather than a restore.
- Will this reduce our cloud bill?
- Often substantially, but we do not lead with it. Right-sizing and removing idle resources is straightforward; the durable saving comes from architecture, and that takes longer to earn.
